Washoe County
Due Date : Ongoing

Project will look at Harvard Way from Yale to Linden Street. The majority of work will be re-configuring transit stops to meet ADA requirements, new curb ramps to meet ADA and new sidewalk to provide connectivity within the corridor....

Washoe County
Due Date : Ongoing

he objective of the RRIF Program review is to evaluate the current system in light of State law impact fee requirements, national case law standards, and current best professional practice, and to identify potential changes that could improve the system in terms of legal defensibility,...

Washoe County
Due Date : Ongoing

Project Description & Purpose The project improvementswill include reconstruction of the existing asphalt concrete roadway. Other work will include removal and replacement of deteriorated concrete curb, gutter, sidewalk, pedestrian ramps, and driveway aprons, as necessary. Water and gas valves, as well as manholes within the...

Washoe County
Due Date : Ongoing

Project Description & Purpose The project improvements will include reconstruction and rehabilitation of the existing roadway sections. Associated work will involve adjustment of manhole and valve covers, replacement of concrete curb, gutter, sidewalk, pedestrian ramps, and driveway aprons as necessary, as well as permanent pavement...

Washoe County
Due Date : Ongoing

Project Description & Purpose The project improvements will include reconstruction of the existing asphalt concrete roadway. Other work will include removal and replacement of deteriorated concrete curb, gutter, sidewalk, pedestrian ramps, and driveway aprons as necessary. Water and gas valves as well as manholes within...

Washoe County
Due Date : Ongoing

Project Description & Purpose The project improvements will include reconstruction and rehabilitation of the existing roadway section. Incidental work will involve adjustment of manhole and valve covers, permanent striping, and replacement of concrete curb, gutter, sidewalk, and driveway apron, as necessary. In addition, the turn radius...

Washoe County
Due Date : Ongoing

Project Description & Purpose Rehabilitation of Red Rock Road is planned to include pavement preservation via cold in-place recycling and overlay. Incidental work will involve shouldering and other miscellaneous roadside safety improvements....

Washoe County
Due Date : Ongoing

Project Description & Purpose The project improvements will include reconstruction of the existing asphalt concrete roadway. Other work will include removal and replacement of deteriorated concrete curb, gutter, sidewalk, pedestrian ramps, and driveway aprons as necessary. Water and gas valves as well as manholes within...

Washoe County
Due Date : Ongoing

Project Description & Purpose Preliminary design (30%) and National Environmental Policy Act (NEPA) study to determine if there are environmental impacts associated with the prroposed project will be completed as the first step to the project....